The WMATA Northern Bus Garage Replacement project in Washington, DC required a COBie-compliant BIM model that reflected as-built conditions and ensured system-wide integration. We provided BIM coordination in Washington DC for electrical, SCADA, lightning protection, and fire alarm systems. This supported both design and construction phases in line with WMATA BIM and Asset standards.
● BIM coordination in Washington DC reduced rework and kept the project on schedule.
● COBie-compliant as-built BIM deliverables provided accurate FM data and O&M records.
● Prefabrication drawings streamlined fieldwork and minimized delays.
● Integration of fire alarm, lightning protection, and SCADA systems improved safety and resilience.
● Delivered models fully aligned with WMATA BIM and Asset requirements, strengthening accountability across the lifecycle.
We help you save cost providing world-class BIM services for residential, commercial, infrastructure, mixed-used, educational, sports and industrial projects.
Healthcare | Office Build-out | Commercial Spaces | Hotels & Restaurants
Residential | Commercial | Airports | Metros | Dams | Educational
Oil & Gas Plants | Facility Management | Off-shore Construction | Chemical & Petroleum | Power station
Schools | Colleges | Universities | Library | Learning Center
Apartments | Multi-story | Housing Developments | Buildings | High-Rise Buildings
Airports | Metros | Railways | Tunnel | Bridges | Dams | Canals | Airports | Water & Sewerage System | Pipelines | Railways